Accurate budgeting, cost planning, and financial control throughout the project lifecycle — maximising value, minimising risk, and keeping every project on budget from first estimate to final account.
Estimate Accuracy by Phase
Cost Certainty Curve — Trabimex QS

Cost Management Division
Every dirham accounted for.
98%
Budget Accuracy Rate
340+
Projects Cost-Managed
12B+
MAD Appraised
What We Do
From pre-design feasibility to final account settlement, our cost management team provides financial rigour at every stage of the project lifecycle.
Feasibility estimates, elemental cost plans, and benchmarking against comparable projects. We establish the financial framework before a single line is drawn.
Comprehensive measurement and documentation of all works in accordance with SMM and Moroccan standards — providing the foundation for accurate tender pricing.
Tender evaluation, contractor selection advice, and contract sum negotiation. We ensure the right contractor at the right price with the right conditions.
Monthly cost reports, cash flow forecasts, variation account management, and final account settlement — maintaining financial clarity throughout the build.
Cost Certainty
Cost certainty increases through the project lifecycle. We apply the right level of rigour at each stage — from indicative estimates to cent-accurate final accounts.
01
Order of Cost
Elemental estimate based on m² rates and preliminary programme
±15–20%02
Cost Plan Stage 1
Detailed elemental breakdown aligned to RIBA Stage 2 output
±10–15%03
Cost Plan Stage 2
Measured approximate quantities with priced specification
±5–10%04
Bills of Quantities
Full measured BQ issued for competitive tender
±2–5%05
Contract Cost Control
Monthly CVR reports, variation account, EAC updates
Live tracking06
Final Account
Negotiated and certified final account settlement
Agreed sumCost Certainty · Budget Precision · Trabimex QS
How We Work
The right cost analysis method for the right project. We match technique to risk profile, project complexity, and the client's need for cost certainty.
Breakdown of project cost into elements (substructure, superstructure, finishes, services) to track value by trade and identify cost risk.
Capital cost + operational + maintenance + end-of-life costs modelled over a defined appraisal period to support value engineering decisions.
Integration of scope, schedule, and cost to measure project performance against baseline and forecast at completion with confidence.
Monte Carlo simulation and quantified risk registers applied to estimates — translating uncertainty into contingency allocations and confidence bands.
Systematic review of design options against cost, function, and programme — removing unnecessary cost without sacrificing performance.
What You Receive
Standard across all mandates
□
Early-stage budget and funding model
▦
Structured budget by construction element
▤
Full measured tender documentation
▧
Contractor comparison and recommendation
▨
Cost Value Reconciliation during construction
▩
Projected spend by period against programme
◱
Real-time change management log
◼
Agreed settlement and lessons learned

Trabimex Cost Management
Budgeted.
Tracked. Delivered.
Project
Sector
Contract Value
Scale
Status
Hospitality
240M MAD
18,400m²
Completed 2024Residential
180M MAD
R+12 × 6 blocks
OngoingEducation
310M MAD
22,000m²
Completed 2022Infrastructure
95M MAD
64m span
Completed 2023Mixed-Use
520M MAD
R+18
Completed 2024Civil
430M MAD
3 × 42m spans
OngoingNeed a quantity surveyor?
Whether you need a feasibility estimate for a new development, a cost plan for a planning submission, or ongoing financial control through construction — our QS team is ready.
Start a Conversation
Build your projects

© 2026 Trabimex. Moroccan company based in Marrakech. All rights reserved.